Skip to content
Monday – Friday: 7:30 a.m. – 5:30 p.m.(863) 555-0100

How pricing works

What decides your price

Two roofs the same size can cost very different amounts. These six things move the number most.

  • Size and pitch

    The roof is measured in squares of 100 sq ft. Steeper roofs need more safety gear and time.

  • Layers to remove

    A second layer costs more to tear off and haul away.

  • Deck condition

    Found only after tear-off, so it is priced per sheet, in writing, before the work.

  • Shape

    Hips, valleys, dormers and chimneys mean more cutting and more flashing.

  • Options

    A secondary water barrier and impact-rated shingles cost more than the base roof.

  • Access, permit and season

    Dumpster space, trees, permit fees and fall demand all move the number.

A sample quote

An average home's estimate, line by line

This is how a written estimate reads before you decide.

  • Shingle re-roof, average home

    About 1,800 sq ft, around 24 squares, one layer off, plain hip roof.

    • Tear-off and haul-away
    • Deck check, bad sheets priced per sheet
    • Synthetic underlayment, drip edge, starter
    • Architectural shingles and ridge caps
    • Pipe boots, flashing and vents
    • Crew labor to install
    • Permit and inspection fee

Example only. Decking found rotted after tear-off is billed per sheet at the price written in your estimate, and only for the sheets replaced.

The estimate

What is in it, and what is not

Set it beside any other quote, line for line.

  • In the estimate

    • Tear-off and disposal

    • Deck check and a price per sheet

    • Underlayment, drip edge and starter

    • Shingles, ridge caps, boots and vents

    • Permit, inspection and cleanup

    • The workmanship warranty, with its terms in writing

  • Not in it, unless we find it

    • Decking beyond the stated sheets

    • Rafter, fascia or soffit repair

    • Chimney masonry, skylights and gutters

    • Repairs inside the house from old leaks

    • Extra layers to remove

    • Upgrades an inspector requires

The visit

What happens when we come to look

  1. 01

    Step 1: You call or text

    Tell us the address, the roof's age if you know it, and whether water is coming in.

  2. 02

    Step 2: A look from the ground

    We walk the yard and check gutters, fascia and soffit.

  3. 03

    Step 3: On the roof, tied off

    Covering, flashing, boots and vents, photographed as we go.

  4. 04

    Step 4: The attic

    If you let us in: stains, daylight, damp insulation and airflow.

  5. 05

    Step 5: Measuring

    Squares, pitch, layers and complexity.

  6. 06

    Step 6: Photos and a written estimate

    We show you what we saw, explain repair versus replace and send options in writing.

Paying

How you pay

  • Deposit and schedule

    Your contract states the deposit and each payment, and when each one is due.

  • Check or card

    Pay by check or card on that schedule. The price is the same either way.

  • Financing, if you want it

    It goes through a lender, who sets the rate, term and payment. The home page shows an example with every term.

    See the example

About estimates

Is the estimate a firm price?

It is the price for the work written on it. The one thing that can change is the number of decking sheets replaced, at the price per sheet already stated.

Do I need to be home for the visit?

Not for the roof. We only need you if you want the attic checked from inside.

Can I compare your estimate with others?

Please do. Ask each roofer for the deck price per sheet, the underlayment and the permit, in writing.

Want your own number?

Tell us the address and we will set a visit.